Agaricus bisporus and its management

Agaricus bisporus mycelia can be covered with soil when the full material layer is close to the bottom of the bed. The paddy soil and peat soil are mixed and covered at one time, and the thickness of the soil is preferably 3.5-4 cm. The covering material must be disinfected.

After one day of soil covering, it enters the management period after soil covering. The focus of management is to promote the combination of control and control, and finally make the soil layer mycelia thick enough to prepare for mushroom production; on the other hand, we must control the "hanging mycelium" part, so that the mycelium cannot be tangled prematurely It is also necessary to control the mycelia of the soil layer to prevent them from growing. The room temperature is maintained at 21 ° C to 22 ° C, and the bed temperature is maintained at 24 ° C to 25 ° C. When the hypha covered 80% of the soil surface, the temperature should be immediately lowered, and the temperature should be controlled between 16 ° C and 18 ° C to promote the formation of the mushroom base.

Disclaimer: Some articles on this website are transferred from the Internet. If third party legal rights are involved, please inform this website to deal with them. phone

ZHOUSHAN SINOMEGA BIOTECH ENGINEERING CO.,LTD , https://www.sinomegabiotech.com

Posted on