How to debug the steam boiler of Xuen steam generator manufacturer?


Electric heating steam generator commissioning

Operating procedure: After the steam generator and water softener are installed, follow the procedure:

1. Before the product leaves the factory, the factory has comprehensively debugged the key parts of the steam generator's heating pipe, control box, safety valve, pressure controller, sewage pump and water pump.

2. Under normal circumstances, as long as the water and electricity are all connected as shown in the figure, the button of the control box can be opened to enter the fully automatic operation without the need for the user to debug again.

3. The commissioning of water treatment should refer to the water disposal part of the original application certificate book. Press ON/OFF button, the power light is on, turn on the power, add water to light, add water, pump is used, open water supply valve, add soft water to the water tank, power indicator light is on, normal water level light is on, heating reaches higher pressure, lowering to lower setting Pressure, from new heating. Press the ON/OFF button, the heating light is on, the water supply light is on, the heating light is off, the heating light is on, the heating starts, and the power supply light is off.


Octopus In Flower Shape

Frozen Octopus,Octopus Frozen Seafood,Frozen Seafood Octopus,Octopus In Flower Shape

Zhejiang Zhoushan Jiaze Aquatic Co., Ltd. , https://www.tianjia-aquatics.com

Posted on