Correct use of pellet feed processing equipment

In order to enable the normal operation of pellet feed processing complete sets of equipment, prolong its service life, reduce failures, and increase economic efficiency, China Animal Husbandry Equipment Network offers several points for reference.

1 Installation and commissioning of equipment

1.1 Before installation, check the layout of the equipment and the foundation plan to check whether the dimensions of the installation foundations meet the requirements of the drawings. If any discrepancies are found, rework should be carried out until the dimensions are correct and then install them.

1.2 The installation personnel should be familiar with the installation requirements of various equipment and strictly follow the technical requirements for construction.

1.3 The equipment may cause deformation, damage or loss in the transportation process. Therefore, before installation, check and check the equipment detailed list, and take corresponding measures to ensure that the equipment is in good condition before installation.

1.4 Each equipment shall be numbered before entering the installation site. The installation process flow card and schedule shall be formulated. According to the requirements of the installation process sequence, the equipment shall be transferred to the site one by one for installation.

1.5 Installation sequence: From top to bottom, after the host device and rack are in place, install the connecting pipes and electrical equipment.

1.6 Tools required for installation: equipment and village materials must be available.

1.7 After the installation, the rotating parts of the equipment must be flexible, no card, impact and percussive sound. Each connecting part must be firm and sealed, with no leakage, leakage or oil leakage.

1.8 The installation of electrical equipment should comply with the relevant regulations of the State. The direction of each line should be clear and there should be no electricity running or electrical leakage. Wires and cables should have protective shells to prevent rats from biting.

1.9 After installation of all equipment is completed, each stand-alone unit is to be tested for empty vehicles and put into a load test after it is running properly.

1.10 Before the load test, calibrate the electronic batching scale and packing scale to meet the required accuracy.

1.11 The load is running for 8 hours, and it can be provided to the factory for production and use after there is no fault.

2 Operation and use

2.1 The equipment is inspected by the on-duty personnel of each post before driving.

2.1.1 Whether or not foreign objects fall into the equipment; whether the rotating parts are flexible, whether there is card or bump, whether the connection parts are firm, and whether there is any powder leakage, air leakage, or oil leakage. If there is a fault, it should be promptly removed.

Situational Rehabilitation Equipment

Using the latest computer graphics and image technology, the patient is placed in a virtual environment, by picking technology, make the person can see on the screen or take the form of virtual figure, according to the change of scene and in the screen prompt to do all kinds of action, to keep the screen scene pattern continues, until finally complete the training goals.

Occupational Therapy Equipment For Home,Ankle Joint Training Device,Shoulder Joint Convolution Training Apparatus,Situational Rehabilitation Equipment

jinan Fangqi Sunshine education consulting CO.,LTD. , https://www.fzrehabmarket.com

Posted on